ENERGY STORAGE SYSTEM (BESS)
Topband
Topband AIO C&I BESS (M100G215C — 100 kW/215 kWh to 1 MW/2.15 MWh)
M100G215C
100 kW/215 kWh – 1 MW/2.15 MWh