## Project Snapshot
| Field | Detail |
|—|—|
| **Client** | [TO FILL — manufacturer name] |
| **Location** | Cikarang, Bekasi |
| **Year** | [TO FILL] |
| **Sector** | Manufacturing & Industri |
| **Scope** | Supply + Install Panel TM 20kV + Trafo |
| **SEI Unit** | PartnerListrik + SIP Panel |
## Challenge
Pabrik manufaktur ekspansi kapasitas produksi membutuhkan tambahan substation baru dengan panel TM 20kV yang andal, compliant SNI, dan delivery cepat untuk mengejar timeline construction.
## Solution
PT Sarana Energi Investama mendeliver paket turn-key:
1. **Engineering & Single Line Diagram** — Design panel layout sesuai kebutuhan plant
2. **Supply Panel TM Schneider SM6** — Cubicle 24kV dengan VCB Easergy
3. **Trafo Distribusi** — Trafindo / Mastergreen [TO FILL kapasitas]
4. **Installation & Commissioning** — Termasuk testing relay proteksi
5. **Handover Document** — Sertifikat, test report, as-built drawing
## Results
– ✅ Substation commissioning sesuai jadwal proyek
– ✅ Sertifikasi PLN dan SLO clear
– ✅ Zero incident saat energizing
– ✅ Compliance penuh SNI & IEC
## Technology & Brand
– Panel TM: **Schneider SM6 24kV**
– Protection Relay: **Schneider Easergy**
– Transformer: **Trafindo** / Mastergreen
– Cabling: [TO FILL]
—
*[Catatan editor: sesuaikan kapasitas kVA, jumlah cubicle, dan nama klien.]*