Solar PV Rooftop 500 kWp — Logistics Warehouse Tangerang

## Project Snapshot

| Field | Detail |
|—|—|
| **Client** | [TO FILL — logistics company] |
| **Location** | Tangerang, Banten |
| **Year** | [TO FILL] |
| **Sector** | Logistics & Warehouse |
| **Scope** | EPC Solar PV Rooftop 500 kWp |
| **SEI Unit** | PartnerSurya |

## Challenge

Perusahaan logistik dengan luas atap warehouse besar ingin mengurangi biaya listrik PLN dan mendukung target ESG corporate. Kebutuhan: solusi PLTS on-grid yang reliable dengan payback wajar.

## Solution

PartnerSurya menjalankan full EPC scope:

1. **Site Survey & Design** — Structural assessment atap, shading analysis, simulasi PVsyst
2. **Procurement** — Modul mono-crystalline tier-1, inverter string tier-1, BoS material
3. **Installation** — Mounting system, DC cabling, AC tie-in ke MDP
4. **Commissioning & SLO** — Testing, energizing, dan sertifikasi PLN
5. **Monitoring** — Web-based monitoring platform untuk operator

## Results

– ✅ Generasi tahun pertama ~720 MWh
– ✅ Reduksi tagihan PLN ~Rp 1 Miliar/tahun (estimasi)
– ✅ Payback period ~5-6 tahun
– ✅ CO2 reduction ~600 ton/tahun

## Technology & Brand

– PV Module: Tier-1 mono-crystalline [TO FILL — Jinko/Trina/JA Solar]
– Inverter: [TO FILL — Sungrow/Huawei]
– Mounting: Custom roof-mount sesuai atap
– Monitoring: PartnerSurya platform